Electrical Panel Upgrade Cost

200 A $$$

Upgrading the electrical panel costs, according to the guides consulted, between about $1,200 and $3,500 for the most common jobs, such as replacing the panel or going from 100 to 200 amps. It can rise to $5,000 or more if the meter and service line have to be replaced, and to $8,000 for a 320 to 400 A service. Use the calculator to add up the items in your case.

$1,800National average cost (InchCalculator; 2023 data)
$1,800 to $3,500From 100 to 200 A with a service line in good condition (VoltFlow, 2026)
4 to 8 hoursTypical installation time (HomeServe)
$75 to $250Building permits (VoltFlow)

Estimate the cost of your upgrade

Minimum estimate–
Maximum estimate–
Midpoint–

Our own calculation: a sum of ranges from different sources (VoltFlow, HomeServe and InchCalculator). They may overlap: VoltFlow already includes labor and permits in the main job, and warns that, if the utility requires a new meter, $500 to $1,000 is added. The actual price depends on your area, your utility and the condition of the installation: ask for written quotes.

What it costs by job

JobRangeSource
100 A panel (panel and installation)$1,200 to $1,600HomeServe
200 A panel (panel and installation)$1,300 to $2,500HomeServe
Upgrading to 200 A in an older home$1,750 to $2,500HomeServe
New 200 A panel$1,800 to $3,000 (up to $5,000 if the line has to be replaced)InchCalculator
Panel replacement with the same amperage$1,200 to $2,200VoltFlow
From 100 to 200 A with a service line in good condition$1,800 to $3,500VoltFlow
300 A service$2,000 to $4,500HomeServe
400 A service$4,000 to $6,000HomeServe
Fuse box to new panel$1,500 to $4,500InchCalculator

Sources: HomeServe (published June 2, 2025, updated September 2, 2026; service company), InchCalculator (last updated: August 14, 2023) and VoltFlow (April 2026; commercial site).

Visual comparison

Cost of upgrading the panel by job (different sources)$0$2,000$4,000$6,000$8,000Replacement, same amperage · VoltFlow$1,200 to $2,200100 to 200 A · VoltFlow$1,800 to $3,500200 A panel · HomeServe$1,300 to $2,500200 A panel · InchCalculator$1,500 to $3,000Full 200 A service · VoltFlow$2,500 to $5,000400 A service · HomeServe$4,000 to $6,000320 to 400 A service · VoltFlow$4,000 to $8,000
The sources are not comparable with each other: each uses different dates and assumptions, and not all include the same items.

Items that can add up

Items that can add up (different sources)$0$2,000$4,000$6,000Permit · VoltFlow$75 to $250New meter · HomeServe$200 to $800Subpanel · InchCalculator$500 to $1,000Service line · HomeServe$1,050 to $3,200Smart panel · VoltFlow$4,000 to $6,500
A new meter, a service line or a subpanel can be added to the panel. HomeServe gives labor at $50 to $100 per hour.

What the “amps” on a panel actually mean

The number on the main breaker, 100, 150 or 200 amps, is the maximum current the home can draw at once through the service. Think of it as the width of the pipe that brings electricity in. A bigger panel does not use more power by itself; it just allows you to add circuits without overloading the whole. That is why the question is not “how old is my panel” but “what do I plan to add”.

It also helps to separate two things that quotes sometimes blur: the panel (the box with breakers inside the house) and the service (the meter and the line from the utility). Replacing the panel only is the cheaper job. If the service line or meter has to change too, you are in the $5,000-or-more range mentioned above, and the utility may need to be involved.

An example: adding an EV and a heat pump

VoltFlow estimates about 40 to 50 A for an electric vehicle charger circuit and 30 to 60 A for a heat pump. Together that is 70 to 110 A of circuits on top of what the house already uses. These are breaker sizes, not continuous loads, and only an electrician’s load calculation can say how much your panel can really take. But the numbers show why a 100 A home with an electric stove and a dryer can run out of room quickly.

When it makes sense to upgrade

  • Old or damaged panel: if you still have a fuse box, or a panel from brands such as Federal Pacific, Zinsco or Pushmatic, which according to VoltFlow insurers may require replacing.
  • More consumption: VoltFlow estimates about 40 to 50 A for an electric vehicle charger and about 30 to 60 A for a heat pump.
  • Warning signs: breakers that trip frequently, lights that dim when a large appliance starts, or breakers that add up to more than 80% of the main (VoltFlow).
  • Selling the house: VoltFlow says inspectors and appraisers often flag panels under 200 A.

If the panel is hot, smells of burned plastic, has burn marks or buzzes or sizzles, VoltFlow advises calling an electrician right away and not opening it.

The federal credit is gone

The IRS says the energy efficiency improvement credit covered electrical panels of 200 A or more up to $600 per item, but only for improvements made through December 31, 2025 (page reviewed April 28, 2026). Do not count on it for new work, and check incentives from your state or utility. Source: IRS.

Alternatives worth asking about

  • A load management device. Some installations use equipment that limits two big loads, such as an EV charger and a dryer, from running at full power at the same time. It may avoid or delay an upgrade. Ask your electrician if it applies to your panel.
  • A subpanel. It adds room for circuits when the main panel has no space, though it does not increase the service capacity.
  • Replacing only the panel. If the service is adequate and the panel is the problem (for example, a recalled brand), this is the cheaper fix.

What happens on the day

HomeServe puts the typical installation at four to eight hours. The electrician will usually coordinate with the utility to cut power at the meter, replace the panel, reconnect each circuit and test it, and the work is then inspected. Plan for the house to be without power for most of the working day: freezers and refrigerators will be fine for several hours if kept closed, and anyone with medical equipment should arrange alternatives in advance. If the permit inspection is scheduled afterward, ask who is responsible for that appointment.

Hiring, step by step

  1. Ask a licensed electrician to inspect your panel and calculate your current and future load.
  2. Ask whether the job requires a new meter or service line and when your utility can step in.
  3. Ask for at least three written quotes, with permits and inspection included or itemized.
  4. Check that the electrician handles your municipality’s permit and inspection.
  5. If you are going to install a transfer switch, a battery or a charger, tell them before they quote.

To find out what power you need, see our generator size calculator; to compare backup options, our generator vs. battery article.

Brands that deserve a closer look

VoltFlow names Federal Pacific, Zinsco and Pushmatic as brands that insurers may require replacing. If you have one, tell your electrician early and ask for a written assessment. Even if the panel works today, an insurer or buyer may raise the question later, and it is easier to plan for it than to be surprised.

Is 200 amps always enough?

For most homes, it is the common target; VoltFlow notes that inspectors and appraisers often flag panels under 200 A. A home with several large electric loads may still need a larger service, which the 300 A and 400 A rows in the table show.

Why do the sources give such different prices?

They measure different jobs. A panel swap at the same amperage is not the same as moving from 100 to 200 A with a new service line, and the sources use different years and regions. Itemized local quotes are the only reliable way to know.

Can I do this myself?

No. This is work for a licensed electrician and it requires a permit and inspection in most places. If your panel is hot, smells of burned plastic or buzzes, do not open it and call an electrician right away, as VoltFlow advises.

If the reason for the upgrade is backup power, our guides on generator sizing and generator versus battery explain what to tell the electrician, and if you are planning an EV, see what the charger installation costs.